
Bridge industry
The steel cables of large bridges are subjected to long-term static and dynamic loads, and non-destructive testing is essential to assess the stability of these structures. The construction history of cable-stayed bridge girder in China is basically the past 30 years, and the design service life of the cable is 25 years. It is now in the end-of-life cycle.
SAF Coolest v1.3.1.1 设置面板
GAGSD-ZGYF-JXSVE-SAS
违禁词: First, best, first-class, leading, unique, king, leader, leader, extreme,
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or returnHome Page